St Marys, Woolwich

Projects

Overview

JOB NAME: ST MARYS – WOOLWICH
DURATION: 35 WEEKS
CONTRACT VALUE: 3.5M

SCOPE:

  • Temporary Works Design & Installation
  • Groundworks & RC Frame
  • Below Ground Drainage
  • Tower Crane Supply
  • Piling Design and Installation
  • Grade 3 Waterproofing design & Installation
  • Precast Stair System Design & Installation