15 Clerkenwell Close, Faringdon

Projects

Overview:

JB Structures provided full PC Role along with D&B Shell and Core Contract
Scope included the following:

• Demolition
• Enabling Works
• Piling
• Tower Crane
• RC Frame and Works Ground
• Watertight Basement
• Structural Stone
• Glazing package
• Roofing and membrane

Duration

Value

35 Weeks

£3.5M